The starting point
Guide without stopping.
Passengers should not have to wonder where they are or where they are going. Light supports signage and separates waiting areas from circulation.
- Movement
- Waiting
- Orientation

What is lit
Halls, check-in desks, security, waiting areas and arrival corridors have different uses and rhythms. Light has to support orientation in all of them without turning the terminal into one continuous strip.
Waiting areas need a calm reference; routes need a quick read. Passengers move between the two several times during a journey.
What the project decides
The section of each space, heights, signage and operating conditions determine where luminaires can go. Maintenance is planned with the terminal in service.
Daylight, floor reflections and coexistence with screens and signage matter too. The solution has to work by day and by night.

The waiting area and the arrival corridor share a terminal, but not the same attention.
How it is approached
The work starts from plans, passenger flows and the conditions of the building. That basis compares layers of light and identifies critical points: accesses, changes of direction and waiting areas.
The solution is reviewed with the project team and operations. Phases and service continuity are part of the brief.
What to avoid
- Lighting routes as if they were waiting rooms, trusting orientation to signage alone and leaving maintenance until the end.
- It is also worth avoiding light that disappears in daylight or competes with information screens.
Pieces for movement.
Real Conalux catalogue pages. The choice is defined with the project's technical team.
From the first plan to the right questions.
Architects, specifiers, contractors and project owners: gather the information that will help you discuss your project with Conalux.
The context
The sector, the spaces involved and their intended uses.
The space
Plans, dimensions, materials and opportunities for integration.
The constraints
The schedule, operating conditions and technical requirements to explore.
Frequently asked questions
What information should be gathered to start?
Plans of the areas involved, expected flows, heights and operating conditions. If the terminal is live, the phases that are possible as well.
Can works be carried out without stopping operations?
It can be planned in phases and areas, with a continuity plan agreed with operations. Feasibility is defined case by case.
How is orientation kept by day and by night?
With a continuous reading of routes and a clear separation between waiting and movement, reviewed against daylight and existing signage.
Your terminal, in the catalogue
Conalux brings together the solutions and advice to prepare the lighting for your terminal.
Explore Conalux solutions

